CHANNELS SATELLITE IPTV FORUMS
русский romana english 




:

[21.12.2008] Ariane 5 Sixth and final launch of 2008

Published at 10:42 GMT+2.

21 December 2008 Image above: Ariane 5s mission with HOT BIRD 9 and W2M was the launch vehicles sixth flight in 2008. Yesterday evening, an Ariane 5 ECA launcher lifted off from Europes Spaceport at Kourou, in French Guiana, on its mission to place two multi-role telecommunications satellites into geostationary transfer orbits. Lift-off of flight V186 took place at 23:35 CET/Paris on 20 November (22:35 UTC/GMT; 19:35 UTC-3/Kourou). The satellites were accurately injected into the correct transfer orbits about 30 minutes later. The payload comprised Hot Bird 9, which will deliver television signals and interactive services to direct-to-home antennas and cable networks throughout Europe, North Africa and the Middle East, and W2M, which will provide television broadcasting and data network services to the same regions using a fixed antenna, while a steerable beam will be re-oriented in-orbit to deliver services as required. The payload mass was 9220 kg; the satellite masses totalled 8340 kg, with payload adapters and dispensers making up the additional 880 kg. Arianespace and Europes Spaceport are planning as many as eight launches during 2009 which will make it the busiest year ever for Ariane 5. The ability to sustain high launch rates has already been demonstrated during the period 12-month period from August 2007 to August 2008, there were nine launches (V177 to V185, inclusive). Flight timeline The Ariane 5s cryogenic, liquid fuelled main engine was ignited first. Seven seconds later, the solid fuel rocket boosters were also fired, and a fraction of a second after that, the launch vehicle lifted off. The solid boosters were jettisoned 2 min: 20 sec after main engine ignition, and the fairing protecting the payload during the climb through the Earths atmosphere was discarded at 3 min: 16 sec. The launchers main engine was shut down at 8 min: 57 sec; six seconds later, the main cryogenic stage separated from the upper stage and its payload. Four seconds after main stage separation, the engine of the launchers cryogenic upper stage was ignited to continue the journey. The upper stage engine was shut down at 24 min: 55 sec into the flight, at which point the launch vehicle was travelling at 9308 m/s (just over 33 500 km/h) at an altitude of 708 km and the conditions for geostationary transfer orbit injection had been achieved. At 26 min: 44 sec after main engine ignition, Hot Bird 9 separated from the launchers upper stage, followed by W2M at 32 min: 10 sec.

Source: http://www.rdi-board.com
Discussion on forum: ( ..)

Print
 

News:

!



ANALAGOUS NEWS...

[04.11.2009] Eutelsat W7 satellite due for launch on 23 November

[22.09.2009] Eutelsat about to double capacity at 36 East

[14.09.2009] GlobeCast invests 2million in upgrades for HD delivery of UEFA Champions League

[09.09.2009] EUTELSAT STATEMENT ON LAUNCH OF W7 SATELLITE

[18.02.2009] Eutelsat Communications announces the full entry into commercial service of its HOT BIRD 9 satellite at 13 degrees East

[31.01.2009] Eutelsat W2M Experiences Power Failure

[29.10.2008] SES Orders New SIRIUS 5 Satellite From Loral

[21.04.2008] Amos-3

[17.01.2008] Sirius-2 now ready to move to 23.5 east

[21.06.2007] British investment fund wins control of Intelsat

[07.06.2007] From June TV Cabo will be sending a new card to all it's customers with digital tv receivers for the service that they subscribe.

[27.11.2006] TPS changed its algorythm

[12.10.2006] Digital+ free to air from 20 till 23 this Month

[24.09.2006] ABS acquires of LMI from Lockheed Martin

[15.09.2006] BBC to take capacity on 12.5W AB1
 
FRESH NEWS...

[24.02.2019] SES teams up with Kartina TV

[13.10.2017] Young Sheldon Review: The Emotional Complexity of this Big Bang Theory Prequel Will Stun Haters and Fans Alike

[09.01.2016] Gazprom-media launches new TNT4 federal TV channel

[07.06.2013] Showtime Puts An End to 'The Borgias' After Three Seasons

[17.01.2012] Magtisat - First DTH TV Platform In Georgia Starts Via ASTRA

[10.12.2011] GlobeCast expands satellite capacity in Russia and CIS Countries

[02.12.2011] EUTELSAT, ONE GROUP, ONE NAME, ONE FLEET

[10.11.2011] Eutelsats W3C Satellite In Full Commercial Service

[09.10.2011] SES Secures Further Contract With Channel 4 On ASTRA 1N

[09.10.2011] Istanbul FM TV Broadcasts On SES 31.5 Degrees East

: Home :: Articles :: Satellite :: Forums :: Channels :: Terrestrial :: IPTV :: News :: Contacts :